LUTUM CO · GA·EST 1968 · CONCRETE SUBCONTRACTOR

Enterprise
Command Center

Portfolio operations across 9 concrete jobs · $2.63M pipeline. Resource coordination, fleet allocation, and historical benchmarking — wired to your real data.

Active
2
Bidding
3
Closed
4
Project portfolio·Georgia · 9 active locations

Portfolio Performance

Trailing 8 quarters · all jobs combined

REV 02 · Q1 2026
01Portfolio value
$2.63M
+12.4%2 active · 3 bidding
02Gross profit
$929K
+35.3%avg margin · 4 closed
03Documents processed
24
+9292 queued · 116 total
04Fleet utilization
68.7%
83% crewactive assets · this week
Status mix
2Active3Bidding4Done
A

Cross-project insights

AI-detected resource conflicts, cash flow gaps, and deployment opportunities

5 ACTIVE
CRITICALequipment overlap

Concrete Pump (pump_01) scheduled on both Peak Covington (C&G Pour) and FKC (Building Pad) during week of Feb 9-15.

Action ›Schedule FKC pour for Feb 16 or rent backup pump ($2,800/week)

Peak CovingtonFKC Adairesville
Save
$2,800.00
WARNINGcrew shortage

Cuscowilla project start (Mar 23) requires 10-person crew but only 8 crew members will be available.

Action ›Hire 2 additional finishers or delay Cuscowilla start by 2 weeks

Cuscowilla on Lake Oconee
Save
$5,000.00
WARNINGcash flow gap

Three projects (Auburn Square, FKC, Maepole) all in mobilization phase during Feb 16-28. Combined mobilization cost: $47,500.

Action ›Stagger mobilization by 1 week each or arrange line of credit extension

Auburn SquareFKC AdairesvilleMaepole Cumming
NO COST IMPACT
OPPORTUNITYopportunity

Compactor_02 and Screed_01 are idle. Available for immediate deployment to accelerate Auburn Square timeline.

Action ›Assign idle equipment to Auburn Square to reduce flatwork duration by 3 days

Auburn Square
Save
$3,600.00
WARNINGresource conflict

Foreman Mike Torres assigned to Peak Covington through Apr 6. Auburn Square needs foreman starting Apr 21 — 2-week gap.

Action ›Assign James Wilson to Auburn Square or hire project foreman

Peak CovingtonAuburn Square
NO COST IMPACT
B

Project timeline

Phased schedule across the portfolio · color-coded by activity type

GANTT · 24 MONTHS
C

Client performance

Revenue and margin by general contractor

6 CLIENTS

Gorman Construction

3 jobs
Portfolio share$1,102,772.00
Actual cost$492,076.00
Gross margin
55.4%
STRONG

Swinerton

1 job
Portfolio share$543,906.00
Actual cost$449,999.00
Gross margin
17.3%
OK

Hodges and Hicks

1 job
Portfolio share$401,000.00
Actual cost$309,000.00
Gross margin
22.9%
STRONG

Ecker Construction

2 jobs
Portfolio share$273,912.00
Actual cost$212,755.00
Gross margin
22.3%
STRONG

F.M. Kitchens

1 job
Portfolio share$251,452.00
Actual cost$190,594.00
Gross margin
24.2%
STRONG

Ryals Bros

1 job
Portfolio share$61,518.00
Actual cost$51,205.00
Gross margin
16.8%
OK
D

Unit cost benchmarking

Historical pricing and margin distribution by line item

Line itemUnitJobsAvg priceAvg costSpreadMargin
3000psi 24" C&G (LF)LF8$20.70$16.99
±22%
17.9%
DOT 30" C&G (LF)LF4$27.25$25.00
±4%
8.3%
Concrete Flume (EA)EA1$8,294.00$6,786.00
±0%
18.2%
Curb Inlets (EA)EA4$175.00$112.50
±0%
35.7%
Roll Curb (LF)LF2$19.25$18.00
±18%
6.5%
Throats and Tops (EA)EA5$1,990.00$1,525.00
±3%
23.4%
3000psi 4" Sidewalk (SF)SF7$6.68$4.33
±15%
35.2%
ADA Ramp (EA)EA7$678.57$358.33
±37%
47.2%
Header Curb (LF)LF1$20.00$18.00
±0%
10.0%
Ribbon Curb (LF)LF1$21.00$18.00
±0%
14.3%
10" Colored & Stamped Concrete (SF)SF1$20.00$15.00
±0%
25.0%
DOT Islands (SF)SF1$12.00$7.00
±0%
41.7%
6" Concrete with WWM (SF)SF1$8.00$6.00
±0%
25.0%
Cart Corrals (EA)EA1$3,000.00$2,500.00
±0%
16.7%
Stair Without Knee Walls (LF)LF1$140.00$115.00
±0%
17.9%
6" Concrete Pad with WWM (SF)SF1$10.00$6.00
±0%
40.0%
Bollard Installation (EA)EA1$125.00$75.00
±0%
40.0%
6" Concrete Paving per C7.0 (SF)SF1$6.00$4.75
±0%
20.8%
Building Slab Concrete (SF)SF1$16.83$14.64
±0%
13.0%
Concrete Pumps (EA)EA1$4,000.00$3,500.00
±0%
12.5%
Bollards (EA)EA1$350.00$150.00
±0%
57.1%
4000psi 8" Generator Pad (SF)SF1$12.00$8.00
±0%
33.3%
4000psi 8" Dumpster Pad (SF)SF1$12.00$7.00
±0%
41.7%
Building Concrete (LS)LS2$71,855.00$63,372.50
±23%
11.8%
Stamped & Colored Concrete (SF)SF1$17.00$10.00
±0%
41.2%
8" Dumpster Pad (SF)SF1$12.00$12.27
±0%
-2.3%
6" Concrete Paving (SF)SF1$8.00$5.50
±0%
31.3%
Site & Pickleball (LS)LS1$247,000.00$194,000.00
±0%
21.5%
Cabana (LS)LS1$45,000.00$33,000.00
±0%
26.7%
Wellness Building (LS)LS1$109,000.00$82,000.00
±0%
24.8%
BUILDBID · ENTERPRISE DEMODATA · LUTUM CO · 2024–2026SHEET 1 OF 4 · REV 02